Representatives of Westminster Presbyterian Church (400 I St. SW), Dantes Partners LLC and KGD Architecture presented preliminary concept designs for the new development consisting of two buildings: one building would combine the church on the ground floor and senior housing units located above the church, and another building with an entrance on Makemie Pl SW would consist of 84 condos, developed by Dantes Partners LLC and Bozzuto. The two buildings are to be linked by a sculpture walk that connects to the duck pond.

Click here to read full article.